Summary of data for February 1999

60kW Turbine

100kW Turbine

Hours

%

Hours

%

Hours in month

672

672

Hours available (brake off)

637

94.8

649

96.6

Hours generating

642

95.5

644

95.8

Hours feeding service

542

80.7

565

84.1

Hours in synchronisation

525

525

Energy produced kWh

26,016

38,676

Energy utilised kWh

20,429

29,707

Energy dumped kWh

5,587

8,969

Load factor

64.5

57.55

Hours of service (all sources)

664

98.8

Hours of service (diesel)

84

12.5

Energy provided by diesels kWh

1,292

2.5

Current guaranteed supply

448

Hours diesel generation replaced by wind

364

Service hours extended by wind energy

216

Utilisation of wind energy

77.5

February has had more hours of good generating winds and virtually no calm periods evident by the fact that in the whole month there were only a total of 8hrs. in which there was no service supply. The 60kW turbine was out of service for a total of 29.5 hours in the month, 20 of which were accounted for with the machine being manually shut down due to storm conditions. The 10OkW turbine was out of service for 29 hours in the month. False dump overload trips totalling 8.25 hours made up part of this time but since operator adjustments to the relay overload have been carried out, no more false trips have occurred.


Text and photographs 2008 Dave Wheeler except where otherwise credited. (Logo picture courtesy of Sumburgh SAR)
If you would like to use photographs from this site please contact dave.wheeler@fairisle.org.uk
Further images of Fair Isle are available.  Photographic commissions undertaken, websites authored. 
With over
40,000 visitors to the website each month why not advertise your Fair Isle product or service here?