Fair Isle Renewable Energy Electricity System

Summary of data for January 1999

60kW Turbine

100kW Turbine

Hours

%

Hours

%

Hours in month

744

744

Hours available (brake off)

731

98.3

736

98.9

Hours generating

662

89.0

666

89.5

Hours feeding service

489

65.7

497

66.8

Hours in synchronisation

488

488

Energy produced kWh

22,633

32,926

Energy utilised kWh

18,032

25,636

Energy dumped kWh

4,601

7,290

Load factor

50.7

44.26

Hours of service (all sources)

677

91.0

Hours of service (diesel)

179

24.1

Energy provided by diesels kWh

3,083

6.6

Current guaranteed supply

496

Hours diesel generation replaced by wind

317

Service hours extended by wind energy

181

Utilisation of wind energy

78.6

January has had fewer hours of strong generating winds and more calm periods, hence the 60kW turbine did not generate for 69 available hours, and the 100 kW turbine did not generate for 70 available hours. The 60kW turbine was out of service for 13 hours and the 10OkW turbine for 19 hours in the month. Despite decreased consumption less energy, 11,891 kWh [17,998 kWhI was lost to dump. The increase in diesel generator usage is mainly attributable to the addition of an extra 76 hours to the guarantee period for the month.


Text and photographs 2008 Dave Wheeler except where otherwise credited. (Logo picture courtesy of Sumburgh SAR)
If you would like to use photographs from this site please contact dave.wheeler@fairisle.org.uk
Further images of Fair Isle are available.  Photographic commissions undertaken, websites authored. 
With over
40,000 visitors to the website each month why not advertise your Fair Isle product or service here?