Fair Isle Renewable Energy Electricity System
| Summary of data for March 1999 |
60kW Turbine |
100kW Turbine |
|
Hours |
% |
Hours |
% |
Hours
in month |
744 |
|
744 |
|
Hours
available (brake off) |
723 |
97.2 |
713 |
95.8 |
Hours
generating |
688 |
92.5 |
665 |
89.4 |
Hours
feeding service |
557 |
74.9 |
552 |
74.2 |
Hours
in synchronisation |
534 |
|
534 |
|
|
|
|
|
|
Energy
produced kWh |
24,306 |
|
34,510 |
|
Energy
utilised kWh |
19,816 |
|
27,345 |
|
Energy
dumped kWh |
4,490 |
|
7,165 |
|
|
|
|
|
|
Load
factor |
|
54.45 |
|
46.38 |
|
|
|
|
|
Hours
of service (all sources) |
702 |
94.4 |
|
|
Hours
of service (diesel) |
126 |
16.9 |
|
|
Energy
provided by diesels kWh |
1,798 |
3.7 |
|
|
|
|
|
|
|
Current
guaranteed supply |
496 |
|
|
|
Hours
diesel generation replaced by wind |
370 |
|
|
|
Service
hours extended by wind energy |
206 |
|
|
|
Utilisation
of wind energy |
|
80.2 |
|
|
March has had less wind than in previous months but performance
was again very good with only 42 hours total in the month without service supply. The 60
kW turbine was out of service for a total of only 7.5 hours in the month The 100kW turbine
was out of service for 25 hours in the month, 8 hours of which due to a fault on the dump
load fan and 14 hours overnight with a vibration trip. The remaining 3 hours were to
facilitate replacement of the Yaw Pinion.
|